Solutions to quality problems in winter decoration

Answers:1   |   LastUpdateAt:2012-03-31 22:45:03  

Question
gannet
Asked at 2012-03-31 22:42:41
The solutions to quality problems in the winter decoration
Answer1JAnswered at 2012-03-31 22:45:03
Easy to fall in the winter tiling tiles, ceramic tiles in the pavement before the deal to go through the flood damage, you must bring the water to reach saturation. Only in this way, the union will not only give rise to the absorption of whey is not the cement solid. Solution: Winter floor tiles, ceramic tile on the floor before the deal to go through the flood damage, which should bring the water to reach saturation. Only in this way, the union will not only give rise to the absorption tail is not solid cement jiangshui, but no depletion, shedding phenomenon. Furthermore, both the wall or floor tiles, which moves inside from the outside 24 hours after the transition, when the interior temperature can be adapted to the stones, to avoid emptying after construction, out phenomenon of paving brick delay after pointing. Install expansion joints to stay the winter, when the door decorations, door, window joints should not be too small to avoid the summer heat expansion close relationship, loose. Buy wooden floor, leaving a 2 mm or less, around the joints. Solution: winter decoration, doors, windows, joints should not be too small to avoid the summer heat expansion close relationship, loose. Wood floor shop, surrounded by 2 mm Expansion joints, furniture, must stay out of the interface is about 0.1 mm slit joints, floor and wall formed with a floor pressure transition, can better manage the wall and floor gap is too big disadvantages. Paint Brush effect of winter winds cool the case of bad weather is not suitable for work in the oil industry, as the winter wind adherence large, easy to paint and paint wet when the powder should be selected for brushing windless weather. Solution: high winds cool climate, not the work of the oil industry, as the winter wind paint adhesion great, easy to paint and wet when the dust, you must select the brushing time without wind, to ensure the paint apply not defined a temperature below 5 degrees centigrade, when not Shitu varnish less than 8 degrees Celsius temperature should be strictly according to the temperature of the product description Shitu. To prevent the sand falling on painted surfaces, windows and doors must be closed. Plaster line to control the moisture content of the operation of gypsum ceiling panel, the moisture content of the keel of wood must be controlled below 12%, and the keel should be strong, can not appear at point a loosening . Solution: The operation panel plaster ceiling, the moisture content of wood keel should be controlled below 12%, and the keel must be strong, can not see a release, so you can prevent cracks in the plasterboard ceiling. Among the gypsum board, gypsum board and the joints between the wall place, are leaving gap of 0.5 cm, to reconcile with plaster dust and mortar, latex, and then double standard kraft paper, and then approved putty, plaster line to prevent cracking. 1 | 2 Next (total of 2 pages)
Related Questions
1
  • Answer This Question:Solutions to quality problems in winter decoration